LETONE
How to use the acid hose in acid fracturing?

   Stress crack acidification is called acid stress. In acid pressure construction, if acid pressure is used directly, acid is not only a pressure crack fluid, but also a liquid that reacts with the rock wall of pressure cracks; if non-reactive pre-hydraulic pressure cracks are used, the acid will flow along the water Cracks flow and react with cracked walls. Because of the uneven ground, the reaction between the cracked wall and the acid is irregular. This acid-etched rock wall will form an acid-etched earthworm hole with high conductivity after the fracture is closed, thereby improving the seepage capacity of…

   Stress crack acidification is called acid stress. In acid pressure construction, if acid pressure is used directly, acid is not only a pressure crack fluid, but also a liquid that reacts with the rock wall of pressure cracks; if non-reactive pre-hydraulic pressure cracks are used, the acid will flow along the water Cracks flow and react with cracked walls. Because of the uneven ground, the reaction between the cracked wall and the acid is irregular. This acid-etched rock wall will form an acid-etched earthworm hole with high conductivity after the fracture is closed, thereby improving the seepage capacity of the formation. Its penetration distance is generally between tens of meters and 100 meters, which can improve the control ability of deep oil and gas production.
   Our independently developed and produced super wear-resistant acid fracturing hoses are mainly used for acid fracturing, sand fracturing, hydraulic fracturing pipes, and transporting water-based, oil-based, foam, acid-based and other fracturing fluids under high pressure. The inner layer of the pipe is made of UPE material, which is suitable for wear-resistant sites, and there will be multi-layer winding high-strength super-flexible steel wire or steel wire rope. Its inner layer is also made of wear-resistant and weather-resistant synthetic rubber, which is better suitable for harsh oil exploitation usage scenarios.

   Before the acidizing operation, the artificial bottom hole, sand washing or sand filling must be tested according to the design requirements. Before the acidizing fracturing hose is placed, the well flushing string should be 1~2m below the acidified layer, and 5%~8% dilute hydrochloric acid should be used to flush the well wall and underground string before acidizing. Our acid fracturing string is then lowered to the top or mid-upper portion of the acid layer.

   The oil pipes we produce all have API certificates, so you can buy them with confidence.

Leave a Reply

Your email address will not be published. Required fields are marked *

©2022 Luohe Letone Hydraulic Technology Co., Ltd., all rights